Cosmetics and Food product manufacturer/Supplier to FMCG
· Replacement of existing 200 KVA Tr. with a new 500 KVA Tr. With HTAVR unit
· 11KV Switchyard layout and design to fit Electrical Utilities ( VCB installation )
· Fabrication of ,Cable tray supports , Shed for covering Panels .
· Main Panel & Utility Panel erection & Commissioning.
· 250 KVA DG set Exhaust pipe ( 60 Ft) erection & commissioning.
· Copper and GI Plate earthings (20 Nos)
· Complete Changeover from one system to the other in one single day shutdown.
SITE PICS during Installation & Commissioning of Tr 500 KVA with HT-AVR , 11KV VCB, Cable Tray installation , Main Panel ,Utility Panel at at COSMIC NUTRACOS ,BADDI-HIMACHAL JAN 2020
Transformer Under Installation Transformer After Installation 11 KV VCB Installation