Conduiting before slab casting / Basement Area cable tray & Main Panel installation and cabling / Meter room / Trench design and then placement of VCB and Meter
Transformer 500KVA installation / Copper Earthing for Neutral / VCB commissioning / Plate Earthing at CEPL IMT Faridabad
Inclined & Reverse Thread Identification system PLC PANEL installed on thread rolling system ,combination of PLC and Mechanical pneumatically operated gate to stop NG pieces mixing with Good pieces.